Physical Pipeline Capacities
As of May 18, 2013
(Receipt Point Capacity, MMcf/d)
  May 18, 2013 May 19, 2013
Redwood Path1
Redwood Path Capacity 2,142 2,142
From Gas Transmission Northwest 2,180 2,180
From Ruby 1,500 1,500
Baja Path
Baja Path Capacity2 1,021 1,021
From KRGT - HDL 282 282
From KRGT - Daggett 375 375
From Southern Trails 120 120
From El Paso Natural Gas 1,140 1,140
From Transwestern 400 400
Off-System
To SoCalGas 630 630
To KRGT - HDL 282 282
1As-available volumes may be reduced below this level to accommodate Wild Goose Storage and Lodi Gas Storage withdrawal volumes.

2Aggregated total from all interconnects is limited to the Baja path capacity shown.