| Physical Pipeline Capacities
As of May 18, 2013 (Receipt Point Capacity, MMcf/d) |
||
|---|---|---|
| May 18, 2013 | May 19, 2013 | |
| Redwood Path1 | ||
| Redwood Path Capacity | 2,142 | 2,142 |
| From Gas Transmission Northwest | 2,180 | 2,180 |
| From Ruby | 1,500 | 1,500 |
| Baja Path | ||
| Baja Path Capacity2 | 1,021 | 1,021 |
| From KRGT - HDL | 282 | 282 |
| From KRGT - Daggett | 375 | 375 |
| From Southern Trails | 120 | 120 |
| From El Paso Natural Gas | 1,140 | 1,140 |
| From Transwestern | 400 | 400 |
| Off-System | ||
| To SoCalGas | 630 | 630 |
| To KRGT - HDL | 282 | 282 |
1As-available volumes may be reduced below this level to accommodate Wild Goose Storage and Lodi Gas Storage withdrawal volumes.
2Aggregated total from all interconnects is limited to the Baja path capacity shown.
Pipeline Maintenance News details maintenance events on CGT's backbone transmission pipelines and the corresponding forecast capacity reductions on the Redwood and Baja paths. Physical Pipeline Capacity shows daily physical capacity at the various interconnections to CGT.