©2024 Pacific Gas and Electric Company
- Transmission interconnection handbook
- Distribution interconnection handbook
Learn more about tariffs and plans
Load interconnection
- Section L1-D - Metering Requirements, Distribution (PDF)
- Section L1-T - Metering Requirements, Transmission (PDF)
- Section L2 - Protection and Control Requirements (PDF)
- Section L3 - Substation Design (PDF)
- Section L4 - Operating Procedures (PDF)
- Section L5 - Pre-Energization Test Procedures (PDF)
Generation interconnection
- Section G1 - Metering Requirements (PDF)
- Section G2 - Protection and Control Requirements (PDF)
- Section G3 - Operation Requirements (PDF)
- Section G4 - Operating Procedures (PDF)
- Section G5 - Pre-Parallel Inspection (PDF)
- Section G6 - Siting Policy and Requirements (PDF)
Appendices
- Appendix A - Contact List (PDF)
- Appendix F - Telemetering and Transfer Trip (PDF)
- Appendix H - Power System Stabilizer (PDF)
- Appendix I - Load Operating Agreement (PDF)
- Appendix J - Standby Service Agreement (PDF)
- Appendix K - Load Special Facilities Agreement (PDF)
- Appendix L - Interconnection Agreements for Generators (PDF)
- Appendix Q - Generator Automatic Synchronizers (PDF)
- Appendix R - Generator Protective Relay Requirements (PDF)
- Appendix S - Protection Alternatives for Various Generator Configurations (PDF)
- Appendix T - Battery Requirements for Interconnection to PG&E System (PDF)
Related links
Introduction
The Distribution Interconnection Handbook contains Pacific Gas and Electric Company's (PG&E) requirements on how to interconnect generating facilities or distributed generation (DG) to the PG&E electrical distribution system. This webpage includes supporting documents and addendums to the handbook sections 1-5. It describes additional technical requirements that may not be in the handbook.
Table of Contents
DIH Manual:
- Handbook – Sections 1-5 (PDF) (All of the interconnection requirements in each section of this entire manual have undergone an extensive review. They are currently updated with the latest information as of May 15, 2017)
Technical Documents and Forms:
- Anti-Islanding Guide DIH_TIH Appendix E (PDF) (This document is a guide for conditions that may trigger direct transfer trip (DTT). This document may apply to both distribution and transmission projects)
- Generation Pre-Parallel Inspection Form [G5-1] (PDF) (This form requires project information, equipment specifications, and other data to perform pre-parallel inspections in preparation to energize and synchronize the generator to the PG&E distribution system. This form is required for both distribution and transmission projects and is located on pages 11 and 14 of TIH Section G5 - Pre-Parallel Inspection) (PDF)
- Primary Service Information Form [PS-1](PDF) (This form provides specification information on the make and model of breakers, CT's, DC power supply, relays, and their settings to ensure they meet PG&E requirements)
- Third Party Interconnection Battery Information Sheet and Acceptance Document [FORM AT−1](PDF) (This form provides specification information on the battery, charger, rack, monitoring, and additional battery information. This form is used for both distribution and transmission projects and is located on pages 4 and 5 of TIH Appendix T (PDF))
- TD-1013P-04 Direct Transfer Trip 900 MHz Radio Scheme (PDF) (This document provides information for the installation of 900MHz spread spectrum radio scheme for Direct Transfer Trip (DTT) between two existing substations.)
- TD-1013P-05 PG&E Substation Signage for Third-Party Interconnections (PDF) (This document provides guidance on substation signage for third-party transmission interconnections to the PG&E system. This guidance can also be applied to distribution interconnections)
- TD-2306P-01 Customer-Owned Telemetry Procedure (PDF) (This document provides information of the use of customer-owned telemetry (COT) to support distribution-connected generating facilities’ telemetry requirements, effective October 4, 2021.)
- TD-2306P-01 Customer-Owned Telemetry Procedure Attachment 1 (PDF) (This document lists the tested and approved, customer-owned telemetry (COT) vendors for interoperability with PG&E's Common Smart Inverter Profile (CSIP)-certified IEEE 2030.5 solution.)
- TD-2306P-01 Customer-Owned Telemetry Procedure Attachment 2 (PDF) (This document contains a table that provides the LogEvent information for PG&E.)
- DG Technical White Paper (PDF) (This document is an addendum to this handbook, it describes some of recent technical requirements which are not in the handbook.)
Distribution System Engineering Numbered Documents:
- 053318 Pad-Mounted, Load-Break Switches and Fuses (PDF)
- 053826 Requirements for Distribution Feeder With Synchronous Generating Equipment (PDF)
- 058779 Pole-Mounted Primary Metering Installation, (12 or 21 kV Line) (PDF)
- 060559 Disconnect Switch Requirements for Distributed Generation Customers (PDF)
- 066195 25 kV Underarm Side-Break Switch (PDF)
- 066208 Installation of Automatic Subsurface Interrupters for Primary Equipment Enclosures (PDF)
- 068188 Installation of Pad-Mounted Interrupters for Underground Distribution Lines (PDF)
- 076249 Virtual Net Energy Metering Installations (PDF)
- 094669 Installing OH Distribution Line Reclosers (PDF)
- 094670 Supply Side Interconnection Requirements for Distributed Generation (PDF)
- 094673 Distributed Generation Interconnection Requirements - Low Voltage Distribution Secondary Spot and Grid Networks (PDF)
- 094676 Primary Electric Service Requirements (PDF)
- 094680 Interconnecting Large 2-20MW Generation Systems (PDF)
- 094681 Distributed Generation Protection Requirements (PDF)
- 094682 Functionally Equivalent Non−Import Configuration Testing Requirements (PDF)
- 094684 Green Meter Adapter (GMA) for Customer Generation (PDF)
Single Line Drawing Examples:
Approved Equipment:
- Cross Reference for Safety Switches - Eaton (PDF)
- Cross Reference for Safety Switches - Siemens (PDF)
- Primary Voltage Disconnect Switches (PDF) (This document lists the PG&E approved disconnect switches (2,400 - 25,000 volts) for Customer Generation Sources.)
- Eligible Inverters
- List of Incentive Eligible Photovoltaic Modules
Transmission Interconnection Handbook Documents:
(Various requirements in these documents generally apply to generation entities interconnected to the distribution system as well as the transmission system)
- Appendix E - Anti-Islanding Guide DIH_TIH (PDF) (This document is a guide for conditions that may trigger direct transfer trip (DTT). This document may apply to both distribution and transmission projects)
- Appendix F - Telemetering & Transfer Trip (PDF)
- Appendix M - Interconnection Data Sheet (PDF)
- Appendix Q - Generator Automatic Synchronizers (PDF)
- Appendix R - Generator Protective Relay Requirements (PDF)
- Appendix T - Battery Requirements for Interconnection to PG&E System (PDF)
Substation Engineering Numbered Documents:
- 034851 Steel Grating Type Switch Operating Platforms (PDF)
- 063436 Electric Revenue High-Voltage Metering (PDF)
- 067910 Grounding Requirements for Outdoor Electrical Substations (PDF)
PG&E Electric Distribution Glossary:
Webpage Updates:
- Change Log (PDF) (This document provides a history of updates to this webpage along with a brief description of the changes.)
Appendix D - engineering numbered documents
034851 - Steel Grating Type Switch Operating Platforms
- Filename
- 034851.pdf
- Size
- 298 KB
- Format
- application/pdf
060559 - Disconnect Switches for Interconnection with Small Power Producers and Cogenerators
- Filename
- 060559.pdf
- Size
- 95 KB
- Format
- application/pdf
066195 - 25kV Underarm Side-Break Switch, Manual and Automated
- Filename
- 066195.pdf
- Size
- 1 MB
- Format
- application/pdf
055103 - Planning Guide for Single Customer Substations Served from Transmission Lines
- Filename
- 055103.pdf
- Size
- 91 KB
- Format
- application/pdf
062143 - Installation Requirements for Time Metered Interruptible Service
- Filename
- 062143.pdf
- Size
- 2 MB
- Format
- application/pdf
067910 - Grounding Requirements for Outdoor Electrical Substations
- Filename
- 067910.pdf
- Size
- 1 MB
- Format
- application/pdf
058779 - Pole-Top Primary Metering Installation, Cluster Mounted (12 or 21 kV Line)
- Filename
- 058779.pdf
- Size
- 182 KB
- Format
- application/pdf
063436 - Electric Revenue High-Voltage Metering
- Filename
- 063436.pdf
- Size
- 264 KB
- Format
- application/pdf
TD-1013P-05 - PG&E Substation Signage for 3rd Party Interconnections
- Filename
- TD-1013P-05.pdf
- Size
- 649 KB
- Format
- application/pdf
More resources for interconnection
Wholesale electric power procurement
PG&E purchases wholesale electric energy and capacity from generators and suppliers.
Register as a supplier
Register your supplier profile and learn how to become a certified supplier. PG&E buyers can contact you with bid or contract opportunities.
Move, sell and store gas
Find out more about gas transmission and storage in California.