IMPORTANT

Manufactured gas plants

PG&E's manufactured gas plant program

History of manufactured gas plants

In the mid-1800s and early 1900s, manufactured gas plants (MGPs) existed throughout California and the United States. These plants used coal and oil to produce gas for lighting, heating and cooking. At that time, this technology was a major step forward. It helped revolutionize street lighting, enhance public safety and enabled businesses to work into the night.

 

In addition to gas, MGPs produced byproducts including coal tar and lampblack. The byproducts that could not be sold were removed for disposal or remained at the MGP site. With the arrival of natural gas around 1930, most of the PG&E MGP sites were no longer needed. They were closed down. As was common practice at the time, byproducts of the gas-making process were left buried on-site.

PG&E manufactured gas plant program

In the 1980s, the United States Environmental Protection Agency (EPA) conducted research of these sites. They found that, in some cases, residues from these facilities may remain on-site and require remediation.

 

Following the EPA study, PG&E established a voluntary program under the oversight of the California Department of Toxic Substances Control (DTSC). The program identified the location of our former MGP sites and began a process of testing soil and groundwater from those sites.

 

To date, PG&E has identified 43 MGPs we formerly owned or operated. We are working to ensure that any potential impacts to the environment from these MGPs are addressed in accordance with today’s regulatory standards. DTSC or its sister agency, the California Regional Water Quality Control Board (Water Board), determine when remediation activities are necessary. We then work closely with the regulatory agency, county and city officials, and nearby businesses and residents to design the most effective remediation program for the site.

 

Our sites are in various stages of remediation, including:

  • Investigation
  • Remedial alternative evaluation and design
  • Active cleanup
  • Post remediation monitoring
  • Project completion

 

Bakersfield MGP

The California Department of Toxic Substances Control (DTSC) has approved PG&E's plans to clean up the site of a former MGP located at 800 and 820 20th Street in Bakersfield. The MGP operated at the site from 1888 through 1910. Cleanup work will include the safe excavation and off-site disposal of soil containing gas plant residues and backfilling excavation areas with clean fill. PG&E is preparing the remediation design and securing the necessary permits. PG&E anticipates cleanup work will begin in late 2025 and last about four months.

 

Learn more in the Bakersfield MGP DTSC Community Update (PDF).

 

Napa MGP

PG&E completed the voluntary cleanup of a former MGP that operated near Riverside Drive and Elm Street in Napa in August 2024. The work was conducted under the oversight of DTSC and addressed contamination in soil and groundwater from historic gas-making activities. Work included excavation and off-site disposal of shallow soil and adding a cement-like mixture to solidify impacts to deeper soil in place. Excavated areas were backfilled with clean, imported fill and the site was restored. This work protects long-term public health and the environment and supports future site redevelopment. PG&E is now working with DTSC to conduct post-remediation soil vapor sampling and groundwater monitoring to confirm the effectiveness of cleanup work. PG&E anticipates the post-remediation and site closure process will take roughly two years. After DTSC certifies that all environmental work is complete, PG&E will entertain redevelopment proposals. 

 

Learn more about the cleanup work that was completed in the Napa MGP PG&E fact sheet (PDF).

 

Vallejo MGP

PG&E completed the cleanup of a former MGP that operated near Curtola Parkway and Sonoma Boulevard in Vallejo in December 2023. The work addressed the contamination of soil and groundwater from historic gas-making activities. Work included excavation and off-site disposal of shallow soil and adding a cement mixture to solidify impacts to deeper soil in place. Excavated areas were backfilled with clean, imported fill and work areas were restored. This work protects long-term public health and the environment and supports future site redevelopment. Remaining boat launch parking lot restoration work is underway and is anticipated to be complete in summer 2025. The site is owned by the City of Vallejo, and they will be responsible for future redevelopment plans.

 

Learn more about the work in the Vallejo MGP PG&E fact sheet (PDF).

 

San Francisco Fillmore and North Beach (Uplands) MGPs

The former Fillmore MGP operated in what is now known as the Marina District in San Francisco, near the area west of Fillmore and Bay Streets. The former North Beach MGP operated near the area north of Bay and Buchanan Streets. A portion of the Fillmore facility was located on an area now covered by asphalt at the southeast corner of the Marina Middle School property.

 

In 2010, PG&E began a voluntary program under the oversight of DTSC to sample for residual materials that may be present at the site of these former MGPs. If DTSC determines that remediation activities are necessary, we:

  • Work closely with the agency, residents, property owners and city health and environmental departments
  • Design the most effective remediation program for the specific site

This is an ongoing program with remediation and restoration of sites within the former Fillmore and North Beach MGP footprints.

 

Learn more from the latest DTSC work notices:

 

San Francisco North Beach (Sediments) MGP - East Harbor and Outside East Harbor

Under the oversight of the Water Board, PG&E is planning to dredge impacted sediments in the Marina East Harbor and Outside East Harbor areas as sediments are impacted by the former North Beach and Fillmore MGPs. As part of this project, the San Francisco Recreation and Park Department (RPD) is also completing Marina improvements.

 

Learn more on RPD’s Marina improvement and remediation project page.

 

San Francisco Beach Street (Uplands) MGP

The former Beach Street MGP operated near the intersection of Beach and Powell Streets in the Fisherman’s Wharf area of San Francisco. The plant was built between 1899 and 1900, and PG&E acquired it in 1911. The plant produced gas for PG&E’s customers until approximately 1931 when it was closed down. The gas holder and oil tanks continued to operate at the site until the mid-1950s when the property was sold and redeveloped for commercial use.

 

A hotel and commercial businesses currently occupy the property. PG&E worked with the property owners under the oversight of the DTSC to conduct soil vapor sampling at the hotel in 2014. DTSC confirmed that sampling results showed there is no health concern for occupants of the hotel or commercial businesses as a result of past site activities, including MGP operations.

 

In 2007, the San Francisco Department of Public Health issued a letter certifying that the soil management reports and the deed restriction on the site satisfy the requirements for the characterization and mitigation of hazardous substances in soil and groundwater. Soil vapor sampling resulted in a No Further Action (NFA) from DTSC. We do not anticipate the need for any additional uplands work.

 

San Francisco Beach Street (Sediments) MGP

Under the oversight of the Water Board, and in partnership with the Port of San Francisco, PG&E is planning to dredge impacted sediments from historic operations of the former nearby Beach Street MGP between the East Marina adjacent to Pier 39 and Pier 43½. The former MGP operated near the intersection of Beach and Powell Streets in San Francisco.

 

It is important to note that health experts, toxicologists and our investigation work have found that PG&E's MGP sites generally do not pose a health risk to surrounding communities. This is because residues, in most cases, are located below protective coverings of fill, sediment, asphalt or concrete. 

Commitment to our customers

As the gas plants were historically located near the center of commerce, many of our sites are in downtown areas. Some are in residential neighborhoods. Before site work begins, PG&E and regulatory agencies, the Water Board and DTSC, meet with nearby residents, businesses and community leaders to:

  • Discuss work plans
  • Address any concerns they may have

We continue this dialogue throughout the entire life cycle of the project. We use work notices, emails, meetings and door-to-door outreach to keep customers informed of our progress.

 

Measures are put in place during remediation to reduce impacts related to noise, dust, odors, vibrations and traffic on nearby homes and businesses. This includes:

  • Air monitoring
  • Using measures such as water and plastic tarps to control dust
  • Installing noise barriers to reduce construction noise
  • Monitoring vibrations and adjusting work efforts as needed
  • Limiting work hours to certain days of the week or hours of the day
  • Restricting the number of trucks that can drive to and from a work site during a given day

 

When remediation is complete, we conduct restoration activities to improve the local community and promote public safety. These include planting, landscaping, repairing sidewalks or constructing new parking spaces.

Contact us

Questions?

If you have additional questions, call our environmental remediation hotline at 1-866-247-0581 or email remediation@pge.com.