"PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. © 2023 Pacific Gas and Electric Company. All rights reserved.
California Gas Transmission
Pipe Ranger
OFO/EFO Outlook
Date | OFO/EFO | Reason |
---|---|---|
10/28/2024 | No OFO | |
10/29/2024 | No OFO | |
10/30/2024 | No OFO | |
10/31/2024 | No OFO |
Pipeline Status
Plan 4, posted 09:43 PM PT
Last updated for the Gas Day of 10/30/2024. Next update expected by 5:30 AM PT. (The Gas Day runs from 7:00 AM to 7:00 AM PT).
Scheduling Status
|
|
System Inventory Status
Ending Inventory History | Ending Inventory Forecasts | ||||||
---|---|---|---|---|---|---|---|
MMcf |
Recent News Articles
Updated
Backbone Transmission and Distribution In-kind Shrinkage Changes
October 21, 2024 at 12:34 p.m.
Requesting CPUC approval by October 13, 2024 ...
CGT Firm Transport Capacity Release
September 25, 2024 at 09:23 a.m.
Process occurs October 1-3, 2024 ...
Updated
High BTU Gas
September 17, 2024 at 06:53 a.m.
Entering system on Tuesday, September 17, 2024 ...
Physical Pipeline Capacity
Physical Pipeline Capacities As of
(Receipt Point Capacity, )
|
||
---|---|---|
Redwood Path |
||
Redwood Path Capacity |
||
From Gas Transmission NW |
||
From Ruby |
||
Baja Path | ||
Baja Path Capacity – Topock |
||
Baja Path Capacity – Hinkley |
||
Baja Path Capacity – Kettleman |
||
From KRGT - HDL |
||
From KRGT - Daggett |
||
From SoCalGas |
||
From El Paso Natural Gas |
||
From Transwestern |
||
Off-System | ||
To SoCalGas |
||
To KRGT - HDL |
Scheduled Volumes
All Volumes in Dth | ||
---|---|---|
Cycle | Cycle | |
Redwood Path | ||
From Gas Transmission Northwest |
||
From Ruby |
||
Total Redwood Path |
|
|
Baja Path | ||
From KRGT-HDL |
||
From KRGT-Daggett |
||
From SoCalGas |
||
From El Paso Natural Gas |
||
From Transwestern |
||
Total Baja Path |
|
|
Off-System | ||
To SoCalGas |
||
To KRGT-HDL |
Interactive Pipeline Map
All volumes are expressed in Dth.
All areas on the map activate on hover. Clicking a selection makes the location stay on screen.
Download Features Provided
Select Date
* Please enter any date after 07/26/2021 in MM/DD/YYYY format.
* This download feature provides a previous gas day’s final Physical Pipeline Capacity and Scheduled Volumes information.
* Yesterday's downloadable information is available after 8:00 a.m. Pacific time.
Pipeline Maintenance
Capacity in MMcf/d | ||
---|---|---|
Dates | Redwood Path | Notes |
October 09 - 31 |
1795 |
Indian Springs Station Maintenance Panoche Station Maintenance
Note: If ISPs (WG, Lodi, CGVS) are on overall net injection, the Redwood Path capacity may increase up to 1970 MMcf/d |
November 01 - 22 |
1728 |
Indian Springs Station Maintenance Panoche Station Maintenance
Note: If ISPs (WG, Lodi, CGVS) are on overall net injection, the Redwood Path capacity may increase up to 1970 MMcf/d |
November 23 - 30 |
2200 |
Indian Springs Station Maintenance |
Capacity in MMcf/d | ||||
---|---|---|---|---|
Dates | Kettleman | Hinkley | Topock | Notes |
October 30 |
500 |
400 |
975 |
L300B Pipeline Maintenance Kettleman Station Maintenance Hinkley Station Maintenance |
October 31 |
500 |
975 |
975 |
Kettleman Station Maintenance Hinkley Station Maintenance |
November 01 |
840 |
975 |
975 |
Kettleman Station Maintenance |
November 04 - 16 |
750 |
750 |
975 |
L300A Pipeline Maintenance |
November 18 - 22 |
960 |
960 |
975 |
Hinkley Station Maintenance |
Limitations at Specific Interconnect Points
Redwood Path
Dates | Capacity | Notes |
---|---|---|
October 07 - 31 |
83 |
Wild Goose Storage Facility net withdrawal limited for maintenance |
October 07 - 31 |
26 |
Central Valley Storage Facility net withdrawal limited for maintenance |
October 07 - 31 |
66 |
Lodi Storage Facility net withdrawal limited for maintenance |
November 01 - 22 |
162 |
Wild Goose Storage Facility net withdrawal limited for maintenance |
November 01 - 22 |
51 |
Central Valley Storage Facility net withdrawal limited for maintenance |
November 01 - 22 |
128 |
Lodi Storage Facility net withdrawal limited for maintenance |
Capacity information is in MMcf/d
Baja Path
Dates | Capacity | Notes |
---|---|---|
October 30 |
192 |
Kern River Station limitation due to Hinkley outage |
October 01 - 31 |
713 |
El Paso Interconnect at Topock limited for maintenance |
November 01 - 30 |
774 |
El Paso Interconnect at Topock limited for maintenance |
Capacity information is in MMcf/d
Storage Maintenance
Injection
Dates | Available Injection | Notes |
---|---|---|
November 01 - 15 |
60 |
Storage Inventory Verification maintenance at PG&E Storage fields. This will impact injections, withdrawals and pipeline balancing. |
November 18 - 22 |
160 |
Storage Inventory Verification maintenance at PG&E Storage fields. This will impact injections, withdrawals and pipeline balancing. |
Capacity information is in MMcf/d
Withdrawal
Dates | Available Withdrawal | Notes |
---|---|---|
November 01 - 15 |
150 |
Storage Inventory Verification maintenance at PG&E Storage fields. This will impact injections, withdrawals and pipeline balancing. |
November 18 - 22 |
550 |
Storage Inventory Verification maintenance at PG&E Storage fields. This will impact injections, withdrawals and pipeline balancing. |
Capacity information is in MMcf/d
Forecasts
Supply and Demand
Forecast for | Forecast for | |
---|---|---|
COMPOSITE TEMPERATURE Historical Average for current day: 59.9 |
||
Demand | ||
On-System Demand | ||
Off-System Deliveries | ||
SoCal Gas KRS | ||
Southwest Gas | ||
Kern River GT - HDL | ||
Transmission Shrinkage | ||
Injection | ||
PG&E Storage Injection (296 Maximum)* | ||
Wild Goose Storage | ||
Central Valley Storage | ||
Lodi Storage | ||
Gill Ranch Storage | ||
Total System Demand | ||
Supply | ||
Interconnect Supply | ||
Gas Transmission Northwest | ||
Ruby | ||
California Production | ||
SoCal Gas (KRS) | ||
Kern River GT - HDL | ||
Kern River GT - Daggett | ||
Southern Trails | ||
El Paso Natural Gas | ||
Transwestern | ||
Withdrawal | ||
PG&E Storage Withdrawal (883 Maximum)* Core, Market Center, and Pipeline Balancing |
||
Wild Goose Storage | ||
Central Valley Storage | ||
Lodi Storage | ||
Gill Ranch Storage | ||
Total System Supply | ||
Inventory Change (Supply - Demand) | ||
Total Customer Imbalance |
Storage Activity
Forecast for |
Forecast for |
|
---|---|---|
Injection | ||
PG&E StorageCore and Market Center | ||
Wild Goose Storage | ||
Central Valley Storage | ||
Lodi Storage | ||
Gill Ranch Storage | ||
Pipeline Balancing Injection | ||
Withdrawal | ||
PG&E StorageCore and Market Center | ||
Wild Goose Storage | ||
Central Valley Storage | ||
Lodi Storage | ||
Gill Ranch Storage | ||
Pipeline Balancing Withdrawal |