California Gas Transmission

Pipe Ranger

OFO/EFO Outlook

Date OFO/EFO Reason
06/27/2024 System Wide High
06/28/2024 No OFO
06/29/2024 No OFO
06/30/2024 No OFO

Pipeline Status

Plan 5, posted 03:33 AM PT

Last updated for the Gas Day of 06/29/2024. Next update expected by 8:00 AM PT. (The Gas Day runs from 7:00 AM to 7:00 AM PT).

View Current Pipeline Status

Scheduling Status

Today
ID1
ID2
ID3
Tomorrow
TIMELY
EVENING
Unprocessed
Processing
Confirmed
Scheduled

System Inventory Status

Ending Inventory History Ending Inventory Forecasts
MMcf
Within Operating Limits
Outside Operating Limits

View System Inventory Status

Recent News Articles

Updated

Implementation of the 2023 Gas Transmission & Storage Cost Allocation and Rate Design Proceeding (CARD)

June 26, 2024 at 03:45 p.m.

Backbone Rate Information (July 2024 – December 2026)

Read Article

news article thumbnail
INSIDEtracc Enhancement - Customizable Dashboard

June 14, 2024 at 08:00 a.m.

Show, hide and rearrange your visual dashboard ...

Read Article

CGT Firm Transport Capacity Release

June 10, 2024 at 09:37 a.m.

Second capacity release on Ruby Pipeline ...

Read Article

Physical Pipeline Capacity

Physical Pipeline Capacities As of
(Receipt Point Capacity, )

Redwood Path

Redwood Path Capacity

From Gas Transmission NW

From Ruby

Baja Path

Baja Path Capacity – Topock

Baja Path Capacity – Hinkley

Baja Path Capacity – Kettleman

From KRGT - HDL

From KRGT - Daggett

From SoCalGas

From El Paso Natural Gas

From Transwestern

Off-System

To SoCalGas

To KRGT - HDL

Scheduled Volumes

All Volumes in Dth
Cycle Cycle

Redwood Path

From Gas Transmission Northwest

From Ruby

Total Redwood Path

Baja Path

From KRGT-HDL

From KRGT-Daggett

From SoCalGas

From El Paso Natural Gas

From Transwestern

Total Baja Path

Off-System

To SoCalGas

To KRGT-HDL

Interactive Pipeline Map

All volumes are expressed in Dth.
All areas on the map activate on hover. Clicking a selection makes the location stay on screen.

Interactive Map Logo
Gas Transmission Northwest - Malin Ruby - Onyx Hill Redwood Path Total Storage Kettleman Station SoCalGas - Kern River Station Kern River Gas Trans. High Desert Lateral - Freemont Peak Hinkley Station Kern River Gas Trans. - Daggett Topock Station Transwestern - Topock North CA Production El Paso - Topock South No Place
Download Features Provided

Select Date

* Please enter any date after 07/26/2021 in MM/DD/YYYY format.

* This download feature provides a previous gas day’s final Physical Pipeline Capacity and Scheduled Volumes information.

* Yesterday's downloadable information is available after 8:00 a.m. Pacific time.

Pipeline Maintenance

Capacity in MMcf/d
Dates Redwood Path Notes

June 27 - 30

2110

Indian Springs Station Maintenance

July 01 - 10

2090

Indian Springs Station Maintenance

July 11

2010

Tionesta Station Maintenance

July 12 - 13

2090

Indian Springs Station Maintenance 

July 14

2040

Indian Springs Station Maintenance 

July 15 - 18

1890

Burney Station Maintenance

July 19

1990

Burney Station Maintenance 

July 20 - 21

2090

Indian Springs Station Maintenance

July 22

2080

Delevan Station Maintenance

July 23 - 24

2050

Delevan Station Maintenance 

Gerber Station Maintenance

July 25 - 31

2090

Indian Springs Station Maintenance

Capacity in MMcf/d
Dates Kettleman Hinkley Topock Notes

June 17 - 28

500

540

975

Hinkley Station Maintenance

L300B Pipeline Maintenance 

L300A Pipeline Maintenance

June 29 - 30

500

600

975

Hinkley Station Maintenance

L300B Pipeline Maintenance

July 01 - 07

500

600

975

L300A Pipeline Maintenance

July 08 - 26

380

600

975

L300A Pipeline Maintenance

Kettleman Station Maintenance

July 27 - 31

500

975

975

L300A Pipeline Maintenance

Limitations at Specific Interconnect Points

Redwood Path

Dates Capacity Notes

Capacity information is in MMcf/d

Baja Path

Dates Capacity Notes

June 01 - 30

713

El Paso Interconnect at Topock limited for maintenance

July 01 - 31

713

El Paso Interconnect at Topock limited for maintenance

Capacity information is in MMcf/d

Storage Maintenance

Injection

Dates Available Injection Notes

Capacity information is in MMcf/d

Withdrawal

Dates Available Withdrawal Notes

Capacity information is in MMcf/d

Forecasts

Supply and Demand

Forecast for Forecast for

COMPOSITE TEMPERATURE

Historical Average for current day: 69.4

Demand
On-System Demand
Off-System Deliveries
SoCal Gas KRS
Southwest Gas
Kern River GT - HDL
Transmission Shrinkage
Injection
PG&E Storage Injection (204 Maximum)*
Wild Goose Storage
Central Valley Storage
Lodi Storage
Gill Ranch Storage
Total System Demand
Supply
Interconnect Supply
Gas Transmission Northwest
Ruby
California Production
SoCal Gas (KRS)
Kern River GT - HDL
Kern River GT - Daggett
Southern Trails
El Paso Natural Gas
Transwestern
Withdrawal
PG&E Storage Withdrawal (490 Maximum)*
Core, Market Center, and Pipeline Balancing
Wild Goose Storage
Central Valley Storage
Lodi Storage
Gill Ranch Storage
Total System Supply
Inventory Change (Supply - Demand)
Total Customer Imbalance

Storage Activity

Forecast for

Forecast for

Injection
PG&E StorageCore and Market Center

Wild Goose Storage

Central Valley Storage

Lodi Storage

Gill Ranch Storage

Pipeline Balancing Injection

Withdrawal
PG&E StorageCore and Market Center

Wild Goose Storage

Central Valley Storage

Lodi Storage

Gill Ranch Storage

Pipeline Balancing Withdrawal