California Gas Transmission

Pipe Ranger

OFO/EFO Outlook

Date OFO/EFO Reason
11/21/2024 No OFO
11/22/2024 No OFO
11/23/2024 System Wide High
11/24/2024 System Wide High

Pipeline Status

Plan 4, posted 09:33 PM PT

Last updated for the Gas Day of 11/23/2024. Next update expected by 5:30 AM PT. (The Gas Day runs from 7:00 AM to 7:00 AM PT).

View Current Pipeline Status

Scheduling Status

Today
ID1
ID2
ID3
Tomorrow
TIMELY
EVENING
Unprocessed
Processing
Confirmed
Scheduled

System Inventory Status

Ending Inventory History Ending Inventory Forecasts
MMcf
Within Operating Limits
Outside Operating Limits

View System Inventory Status

Recent News Articles

Prepare for Potential Extreme Cold Weather Events 2024

November 14, 2024 at 07:40 a.m.

Getting ready for winter ...

Read Article

Potential Hold On Constraint and Path Limits - 11/13/24

November 13, 2024 at 06:52 a.m.

Affecting gas day November 13, 2024 ...

Read Article

Decrease On the Redwood Path Limit - Gas Day 11/08/2024

November 08, 2024 at 12:35 p.m.

Decrease On the Redwood Path

Read Article

Physical Pipeline Capacity

Physical Pipeline Capacities As of
(Receipt Point Capacity, )

Redwood Path

Redwood Path Capacity

From Gas Transmission NW

From Ruby

Baja Path

Baja Path Capacity – Topock

Baja Path Capacity – Hinkley

Baja Path Capacity – Kettleman

From KRGT - HDL

From KRGT - Daggett

From SoCalGas

From El Paso Natural Gas

From Transwestern

Off-System

To SoCalGas

To KRGT - HDL

Scheduled Volumes

All Volumes in Dth
Cycle Cycle

Redwood Path

From Gas Transmission Northwest

From Ruby

Total Redwood Path

Baja Path

From KRGT-HDL

From KRGT-Daggett

From SoCalGas

From El Paso Natural Gas

From Transwestern

Total Baja Path

Off-System

To SoCalGas

To KRGT-HDL

Interactive Pipeline Map

All volumes are expressed in Dth.
All areas on the map activate on hover. Clicking a selection makes the location stay on screen.

Interactive Map Logo
Gas Transmission Northwest - Malin Ruby - Onyx Hill Redwood Path Total Storage Kettleman Station SoCalGas - Kern River Station Kern River Gas Trans. High Desert Lateral - Freemont Peak Hinkley Station Kern River Gas Trans. - Daggett Topock Station Transwestern - Topock North CA Production El Paso - Topock South No Place
Download Features Provided

Select Date

* Please enter any date after 07/26/2021 in MM/DD/YYYY format.

* This download feature provides a previous gas day’s final Physical Pipeline Capacity and Scheduled Volumes information.

* Yesterday's downloadable information is available after 8:00 a.m. Pacific time.

Pipeline Maintenance

Capacity in MMcf/d
Dates Redwood Path Notes

November 07 - 22

1728

Indian Springs Station Maintenance

Panoche Station Maintenance 

 

Note: If ISPs (WG, Lodi, CGVS) are on overall net injection, the Redwood Path capacity may increase up to 2070 MMcf/d

November 23 - 30

2200

Indian Springs Station Maintenance

December 01

2170

Indian Springs Station Maintenance

Gerber Station Maintenance 

December 02 - 09

2080

Indian Springs Station Maintenance

Gerber Station Maintenance

December 10

2160

Indian Springs Station Maintenance

Gerber Station Maintenance

December 11

1970

Indian Springs Station Maintenance

Tionesta Station Maintenance

December 12

2110

Indian Springs Station Maintenance

Tionesta Station Maintenance

Bethany Station Maintenance 

December 13 - 31

2220

Indian Springs Station Maintenance 

Capacity in MMcf/d
Dates Kettleman Hinkley Topock Notes

November 21 - 23

550

940

975

Hinkley Station Maintenance

November 24 - 27

550

975

600

Topock Station Maintenance

November 28 - 30

550

975

975

Kettleman Station Maintenance

December 05 - 06

720

720

945

L300A Pipeline Maintenance

December 12 - 13

900

945

945

Kettleman Station Maintenance 

Limitations at Specific Interconnect Points

Redwood Path

Dates Capacity Notes

November 01 - 22

162

Wild Goose Storage Facility net withdrawal limited for maintenance

November 01 - 22

51

Central Valley Storage Facility net withdrawal limited for maintenance

November 01 - 22

128

Lodi Storage Facility net withdrawal limited for maintenance

Capacity information is in MMcf/d

Baja Path

Dates Capacity Notes

November 01 - 30

774

El Paso Interconnect at Topock limited for maintenance

December 01 - 31

774

El Paso Interconnect at Topock limited for maintenance

Capacity information is in MMcf/d

Storage Maintenance

Injection

Dates Available Injection Notes

November 18 - 22

160

Storage Inventory Verification maintenance at PG&E Storage fields. This will impact injections, withdrawals and pipeline balancing.

Capacity information is in MMcf/d

Withdrawal

Dates Available Withdrawal Notes

November 18 - 22

550

Storage Inventory Verification maintenance at PG&E Storage fields. This will impact injections, withdrawals and pipeline balancing. 

Capacity information is in MMcf/d

Forecasts

Supply and Demand

Forecast for Forecast for

COMPOSITE TEMPERATURE

Historical Average for current day: 53.4

Demand
On-System Demand
Off-System Deliveries
SoCal Gas KRS
Southwest Gas
Kern River GT - HDL
Transmission Shrinkage
Injection
PG&E Storage Injection (211 Maximum)*
Wild Goose Storage
Central Valley Storage
Lodi Storage
Gill Ranch Storage
Total System Demand
Supply
Interconnect Supply
Gas Transmission Northwest
Ruby
California Production
SoCal Gas (KRS)
Kern River GT - HDL
Kern River GT - Daggett
Southern Trails
El Paso Natural Gas
Transwestern
Withdrawal
PG&E Storage Withdrawal (867 Maximum)*
Core, Market Center, and Pipeline Balancing
Wild Goose Storage
Central Valley Storage
Lodi Storage
Gill Ranch Storage
Total System Supply
Inventory Change (Supply - Demand)
Total Customer Imbalance

Storage Activity

Forecast for

Forecast for

Injection
PG&E StorageCore and Market Center

Wild Goose Storage

Central Valley Storage

Lodi Storage

Gill Ranch Storage

Pipeline Balancing Injection

Withdrawal
PG&E StorageCore and Market Center

Wild Goose Storage

Central Valley Storage

Lodi Storage

Gill Ranch Storage

Pipeline Balancing Withdrawal