California Gas Transmission

Pipe Ranger

OFO/EFO Outlook

Date OFO/EFO Reason
03/21/2025 System Wide High
03/22/2025 No OFO
03/23/2025 No OFO
03/24/2025 System Wide High

Pipeline Status

Plan 4, posted 10:13 PM PT

Last updated for the Gas Day of 03/23/2025. Next update expected by 5:30 AM PT. (The Gas Day runs from 7:00 AM to 7:00 AM PT).

View Current Pipeline Status

Scheduling Status

Today
ID1
ID2
ID3
Tomorrow
TIMELY
EVENING
Unprocessed
Processing
Confirmed
Scheduled

System Inventory Status

Ending Inventory History Ending Inventory Forecasts
MMcf
Within Operating Limits
Outside Operating Limits

View System Inventory Status

Recent News Articles

Imbalance Gas in Storage Volume Updated - March 1-8, 2025

March 11, 2025 at 09:30 a.m.

Updating gas days March 1-8, 2025 ...

Read Article

Springing Forward on March 9, 2025

March 07, 2025 at 08:10 a.m.

Time changes this Sunday at 2:00 a.m. ...

Read Article

Imbalance Gas in Storage Close to Zero

February 19, 2025 at 11:58 a.m.

Possible suspension of Pipeline Balancing Withdrawal Service ...

Read Article

Physical Pipeline Capacity

Physical Pipeline Capacities As of
(Receipt Point Capacity, MMcf)

Redwood Path

Redwood Path Capacity

From Gas Transmission NW

From Ruby

Baja Path

Baja Path Capacity – Topock

Baja Path Capacity – Hinkley

Baja Path Capacity – Kettleman

From KRGT - HDL

From KRGT - Daggett

From SoCalGas

From El Paso Natural Gas

From Transwestern

Off-System

To SoCalGas

To KRGT - HDL

Scheduled Volumes

All Volumes in Dth
Cycle Cycle

Redwood Path

From Gas Transmission Northwest

From Ruby

Total Redwood Path

Baja Path

From KRGT-HDL

From KRGT-Daggett

From SoCalGas

From El Paso Natural Gas

From Transwestern

Total Baja Path

Off-System

To SoCalGas

To KRGT-HDL

Interactive Pipeline Map

All volumes are expressed in Dth.
All areas on the map activate on hover. Clicking a selection makes the location stay on screen.

Interactive Map Logo
Gas Transmission Northwest - Malin Ruby - Onyx Hill Redwood Path Total Storage Kettleman Station SoCalGas - Kern River Station Kern River Gas Trans. High Desert Lateral - Freemont Peak Hinkley Station Kern River Gas Trans. - Daggett Topock Station Transwestern - Topock North CA Production El Paso - Topock South No Place
Download Features Provided

Select Date

* Please enter any date after 07/26/2021 in MM/DD/YYYY format.

* This download feature provides a previous gas day’s final Physical Pipeline Capacity and Scheduled Volumes information.

* Yesterday's downloadable information is available after 8:00 a.m. Pacific time.

Pipeline Maintenance

Capacity in MMcf/d
Dates Redwood Path Notes

March 20

2110

Antioch Station Maintenance

Gerber Station Maintenance

March 25 - 27

1570

Delevan Station Maintenance

March 28

1675

Delevan Station Maintenance

 

Note: If ISPs (WG and CGVS) are on overall net injection, the Redwood Path capacity may increase up to 1970 MMcf/d

April 01 - 09

1846

L-401 Pipeline Maintenance


Note: If ISPs (WG and CGVS) are on overall net injection, the Redwood Path capacity may increase up to 1900 MMcf/d

April 10

2010

Burney Station Maintenance

Bethany Station Maintenance

April 11

2140

Burney Station Maintenance

Bethany Station Maintenance

April 13

2210

Burney Station Maintenance

Bethany Station Maintenance

April 14

2110

Burney Station Maintenance

Bethany Station Maintenance

April 15

2130

Bethany Station Maintenance

Delevan Station Maintenance

Gerber Station Maintenance

April 16

2050

Gerber Station Maintenance

April 17

2160

Gerber Station Maintenance

April 21

2190

Bethany Station Maintenance

April 22 - 27

1858

L-400-3 Pipeline Maintenance

Bethany Station Maintenance

 

Note: If ISPs (WG and CGVS) are on overall net injection, the Redwood Path capacity may increase up to 1990 MMcf/d

April 28

1852

L-400-3 Pipeline Maintenance

Bethany Station Maintenance

 

Note: If ISPs (WG and CGVS) are on overall net injection, the Redwood Path capacity may increase up to 1940 MMcf/d

April 29

1840

L-400-3 Pipeline Maintenance

Bethany Station Maintenance

Tionesta Station Maintenance

 

Note: If ISPs (WG and CGVS) are on overall net injection, the Redwood Path capacity may increase up to 1870 MMcf/d

April 30

2150

Tionesta Station Maintenance

Bethany Station Maintenance

Capacity in MMcf/d
Dates Kettleman Hinkley Topock Notes

March 16 - 21

830

700

975

Hinkley Station Maintenance

L300A Pipeline Maintenance 

March 22 - 23

830

840

975

Hinkley Station Maintenance

L300A Pipeline Maintenance 

March 24 - 28

830

780

975

Hinkley Station Maintenance

L300A Pipeline Maintenance 

March 29 - 31

830

840

975

Hinkley Station Maintenance

L300A Pipeline Maintenance 

April 01 - 13

550

600

975

L300A Pipeline Maintenance 

Hinkley Station Maintenance

April 14

550

500

975

L300A Pipeline Maintenance 

Hinkley Station Maintenance

April 15 - 18

510

500

975

Milpitas Station Maintenance 

Hinkley Station Maintenance

April 19 - 29

510

840

975

Milpitas Station Maintenance 

Hinkley Station Maintenance

April 30

510

840

930

Milpitas Station Maintenance 

Hinkley Station Maintenance

Topock Station Maintenance

Limitations at Specific Interconnect Points

Redwood Path

Dates Capacity Notes

March 25 - 27

0

Wild Goose Storage Facility Net Withdrawal

March 25 - 27

0

Central Valley Storage Facility Net Withdrawal

March 28

225

Wild Goose Storage Facility Net Withdrawal

March 28

71

Central Valley Storage Facility Net Withdrawal

April 01 - 09

41

Wild Goose Storage Facility Net Withdrawal

April 01 - 09

13

Central Valley Storage Facility Net Withdrawal

April 22 - 27

101

Wild Goose Storage Facility Net Withdrawal

April 22 - 27

32

Central Valley Storage Facility Net Withdrawal

April 28

67

Wild Goose Storage Facility Net Withdrawal

April 28

21

Central Valley Storage Facility Net Withdrawal

April 29

23

Wild Goose Storage Facility Net Withdrawal

April 29

7

Central Valley Storage Facility Net Withdrawal

Capacity information is in MMcf/d

Baja Path

Dates Capacity Notes

March 01 - 31

797

El Paso Interconnect at Topock limited for maintenance

April 01 - 30

774

El Paso Interconnect at Topock limited for maintenance

Capacity information is in MMcf/d

Storage Maintenance

Injection

Dates Available Injection Notes

March 17 - 21

120

Storage Inventory Verification maintenance at PG&E McDonald Island. This will impact injections, withdrawals and pipeline balancing.

Capacity information is in MMcf/d

Withdrawal

Dates Available Withdrawal Notes

March 17 - 21

190

Storage Inventory Verification maintenance at PG&E McDonald Island. This will impact injections, withdrawals and pipeline balancing.

Capacity information is in MMcf/d

Forecasts

Supply and Demand

Forecast for Forecast for

COMPOSITE TEMPERATURE

Historical Average for current day: 55.1

Demand
On-System Demand
Off-System Deliveries
SoCal Gas KRS
Southwest Gas
Kern River GT - HDL
Transmission Shrinkage
Injection
PG&E Storage Injection (175 Maximum)*
Wild Goose Storage
Central Valley Storage
Lodi Storage
Gill Ranch Storage
Total System Demand
Supply
Interconnect Supply
Gas Transmission Northwest
Ruby
California Production
SoCal Gas (KRS)
Kern River GT - HDL
Kern River GT - Daggett
Southern Trails
El Paso Natural Gas
Transwestern
Withdrawal
PG&E Storage Withdrawal (823 Maximum)*
Core, Market Center, and Pipeline Balancing
Wild Goose Storage
Central Valley Storage
Lodi Storage
Gill Ranch Storage
Total System Supply
Inventory Change (Supply - Demand)
Total Customer Imbalance

Storage Activity

Forecast for

Forecast for

Injection
PG&E StorageCore and Market Center

Wild Goose Storage

Central Valley Storage

Lodi Storage

Gill Ranch Storage

Pipeline Balancing Injection

Withdrawal
PG&E StorageCore and Market Center

Wild Goose Storage

Central Valley Storage

Lodi Storage

Gill Ranch Storage

Pipeline Balancing Withdrawal