California Gas Transmission

Pipe Ranger

OFO/EFO Outlook

Date OFO/EFO Reason
02/16/2025 No OFO
02/17/2025 No OFO
02/18/2025 No OFO
02/19/2025 No OFO

Pipeline Status

Plan 2, posted 12:23 PM PT

Last updated for the Gas Day of 02/18/2025. Next update expected by 4:30 PM PT. (The Gas Day runs from 7:00 AM to 7:00 AM PT).

View Current Pipeline Status

Scheduling Status

Today
ID1
ID2
ID3
Tomorrow
TIMELY
EVENING
Unprocessed
Processing
Confirmed
Scheduled

System Inventory Status

Ending Inventory History Ending Inventory Forecasts
MMcf
Within Operating Limits
Outside Operating Limits

View System Inventory Status

Recent News Articles

Potential Hold On Constraint and Path Limits – 2/03/2025

February 03, 2025 at 06:11 a.m.

Affecting gas day February 3, 2025 ...

Read Article

CGT Firm Transport Capacity Release

January 28, 2025 at 06:45 a.m.

Process occurs February 4-6, 2025 ...

Read Article

Updated

Pipe Ranger Website Now Functioning Normally

January 15, 2025 at 01:00 p.m.

Supply and Demand data now loading correctly ...

Read Article

Physical Pipeline Capacity

Physical Pipeline Capacities As of Feb 18, 2025
(Receipt Point Capacity, MMcf)
Feb 18, 2025 Feb 19, 2025

Redwood Path

Redwood Path Capacity

2,210

2,210

From Gas Transmission NW

2,090

2,090

From Ruby

1,500

1,500

Baja Path

Baja Path Capacity – Topock

945

945

Baja Path Capacity – Hinkley

450

450

Baja Path Capacity – Kettleman

830

830

From KRGT - HDL

282

282

From KRGT - Daggett

375

375

From SoCalGas

0

0

From El Paso Natural Gas

797

797

From Transwestern

385

385

Off-System

To SoCalGas

647

647

To KRGT - HDL

282

282

Scheduled Volumes

All Volumes in Dth Feb 18, 2025 Feb 19, 2025
Cycle ID2 Schedule Cycle Timely Schedule

Redwood Path

From Gas Transmission Northwest

1,399,039

1,714,144

From Ruby

27,078

11,200

Total Redwood Path

1,426,117

1,725,344

Baja Path

From KRGT-HDL

0

0

From KRGT-Daggett

0

19,000

From SoCalGas

-99,478

-88,243

From El Paso Natural Gas

79,606

49,285

From Transwestern

97,951

71,595

Total Baja Path

78,079

51,637

Off-System

To SoCalGas

99,478

88,243

To KRGT-HDL

0

0

Interactive Pipeline Map

All volumes are expressed in Dth.
All areas on the map activate on hover. Clicking a selection makes the location stay on screen.

Interactive Map Logo
Gas Transmission Northwest - Malin Ruby - Onyx Hill Redwood Path Total Storage Kettleman Station SoCalGas - Kern River Station Kern River Gas Trans. High Desert Lateral - Freemont Peak Hinkley Station Kern River Gas Trans. - Daggett Topock Station Transwestern - Topock North CA Production El Paso - Topock South No Place
Download Features Provided

Select Date

* Please enter any date after 07/26/2021 in MM/DD/YYYY format.

* This download feature provides a previous gas day’s final Physical Pipeline Capacity and Scheduled Volumes information.

* Yesterday's downloadable information is available after 8:00 a.m. Pacific time.

Pipeline Maintenance

Capacity in MMcf/d
Dates Redwood Path Notes

February 14 - 28

2210

Indian Springs Station Maintenance

March 03

2230

Burney Station Maintenance

March 04 - 06

2030

Burney Station Maintenance

March 07 - 08

2170

Burney Station Maintenance

March 12

2060

Tionesta Station Maintenance

March 13

2180

Tionesta Station Maintenance

March 17

1920

Antioch Station Maintenance

March 18 - 19

1890

Antioch Station Maintenance

Gerber Station Maintenance

March 20

2110

Antioch Station Maintenance

Gerber Station Maintenance

March 25 - 27

1570

Delevan Station Maintenance

March 28

1675

Delevan Station Maintenance

Capacity in MMcf/d
Dates Kettleman Hinkley Topock Notes

February 15 - 21

830

450

945

Hinkley Station Maintenance

L300A Pipeline Maintenance

February 22 - 28

830

830

945

Hinkley Station Maintenance

L300A Pipeline Maintenance

March 01 - 05

830

840

975

Hinkley Station Maintenance

L300A Pipeline Maintenance 

March 06 - 07

830

940

975

Hinkley Station Maintenance

L300A Pipeline Maintenance 

March 08

790

900

930

Hinkley Station Maintenance

L300A Pipeline Maintenance 

March 09 - 16

830

940

975

Hinkley Station Maintenance

L300A Pipeline Maintenance 

March 17 - 21

830

780

975

Hinkley Station Maintenance

L300A Pipeline Maintenance 

March 22 - 31

830

940

975

Hinkley Station Maintenance

L300A Pipeline Maintenance 

Limitations at Specific Interconnect Points

Redwood Path

Dates Capacity Notes

March 25 - 27

0

Wild Goose Storage Facility Net Withdrawal

March 25 - 27

0

Central Valley Storage Facility Net Withdrawal

March 28

225

Wild Goose Storage Facility Net Withdrawal

March 28

71

Central Valley Storage Facility Net Withdrawal

Capacity information is in MMcf/d

Baja Path

Dates Capacity Notes

February 01 - 28

797

El Paso Interconnect at Topock limited for maintenance

March 01 - 14

797

El Paso Interconnect at Topock limited for maintenance

Capacity information is in MMcf/d

Storage Maintenance

Injection

Dates Available Injection Notes

February 01 - 28

120

Planned maintenance at McDonald Island. May impact pipeline balancing services during maintenance duration.  

Capacity information is in MMcf/d

Withdrawal

Dates Available Withdrawal Notes

Capacity information is in MMcf/d

Forecasts

Supply and Demand

Forecast for 2/18/2025 Forecast for 2/19/2025

COMPOSITE TEMPERATURE

Historical Average for current day: 51.7

54

52.9

Demand
On-System Demand 2,385 2,445
Off-System Deliveries
SoCal Gas KRS 52 41
Southwest Gas 9 9
Kern River GT - HDL 0 0
Transmission Shrinkage 17 20
Injection
PG&E Storage Injection (105 Maximum)* 0 0
Wild Goose Storage 0 0
Central Valley Storage 0 0
Lodi Storage 0 0
Gill Ranch Storage 0 0
Total System Demand 2,462 2,515
Supply
Interconnect Supply
Gas Transmission Northwest 1,325 1,610
Ruby 8 24
California Production 21 21
SoCal Gas (KRS) 0 0
Kern River GT - HDL 0 0
Kern River GT - Daggett 0 18
Southern Trails 0 0
El Paso Natural Gas 66 48
Transwestern 91 69
Withdrawal
PG&E Storage Withdrawal (1,002 Maximum)*
Core, Market Center, and Pipeline Balancing
294 49
Wild Goose Storage 254 342
Central Valley Storage 8 8
Lodi Storage 203 193
Gill Ranch Storage 209 148
Total System Supply 2,479 2,529
Inventory Change (Supply - Demand) 16 14
Total Customer Imbalance -237 -17

Storage Activity

Forecast for

2/18/2025

Forecast for

2/19/2025

Injection
PG&E StorageCore and Market Center

28

0

Wild Goose Storage

542

460

Central Valley Storage

64

64

Lodi Storage

0

28

Gill Ranch Storage

21

0

Pipeline Balancing Injection

0

0

Withdrawal
PG&E StorageCore and Market Center

183

49

Wild Goose Storage

796

801

Central Valley Storage

71

71

Lodi Storage

203

222

Gill Ranch Storage

149

148

Pipeline Balancing Withdrawal

220

0