"PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. © 2024 Pacific Gas and Electric Company. All rights reserved.
California Gas Transmission
Pipe Ranger
OFO/EFO Outlook
Date | OFO/EFO | Reason |
---|---|---|
12/19/2024 | No OFO | |
12/20/2024 | No OFO | |
12/21/2024 | No OFO | |
12/22/2024 | No OFO |
Pipeline Status
Plan 4, posted 09:53 PM PT
Last updated for the Gas Day of 12/21/2024. Next update expected by 5:30 AM PT. (The Gas Day runs from 7:00 AM to 7:00 AM PT).
Scheduling Status
|
|
System Inventory Status
Ending Inventory History | Ending Inventory Forecasts | ||||||
---|---|---|---|---|---|---|---|
MMcf |
Recent News Articles
Potential Hold On Constraint and Path Limits – 12/09/2024
December 09, 2024 at 06:52 a.m.
Affecting gas day December 9, 2024 ...
Potential Hold On Constraint and Path Limits – 12/07/2024
December 07, 2024 at 03:57 a.m.
Affecting gas day December 7, 2024 ...
Prepare for Potential Extreme Cold Weather Events 2024
November 14, 2024 at 07:40 a.m.
Getting ready for winter ...
Physical Pipeline Capacity
Physical Pipeline Capacities As of
(Receipt Point Capacity, )
|
||
---|---|---|
Redwood Path |
||
Redwood Path Capacity |
||
From Gas Transmission NW |
||
From Ruby |
||
Baja Path | ||
Baja Path Capacity – Topock |
||
Baja Path Capacity – Hinkley |
||
Baja Path Capacity – Kettleman |
||
From KRGT - HDL |
||
From KRGT - Daggett |
||
From SoCalGas |
||
From El Paso Natural Gas |
||
From Transwestern |
||
Off-System | ||
To SoCalGas |
||
To KRGT - HDL |
Scheduled Volumes
All Volumes in Dth | ||
---|---|---|
Cycle | Cycle | |
Redwood Path | ||
From Gas Transmission Northwest |
||
From Ruby |
||
Total Redwood Path |
|
|
Baja Path | ||
From KRGT-HDL |
||
From KRGT-Daggett |
||
From SoCalGas |
||
From El Paso Natural Gas |
||
From Transwestern |
||
Total Baja Path |
|
|
Off-System | ||
To SoCalGas |
||
To KRGT-HDL |
Interactive Pipeline Map
All volumes are expressed in Dth.
All areas on the map activate on hover. Clicking a selection makes the location stay on screen.
Download Features Provided
Select Date
* Please enter any date after 07/26/2021 in MM/DD/YYYY format.
* This download feature provides a previous gas day’s final Physical Pipeline Capacity and Scheduled Volumes information.
* Yesterday's downloadable information is available after 8:00 a.m. Pacific time.
Pipeline Maintenance
Capacity in MMcf/d | ||
---|---|---|
Dates | Redwood Path | Notes |
December 13 - 31 |
2220 |
Indian Springs Station Maintenance |
January 01 - 06 |
2220 |
Indian Springs Station Maintenance |
January 07 |
2210 |
Indian Springs Station Maintenance Bethany Station Maintenance |
January 08 - 12 |
2220 |
Indian Springs Station Maintenance |
January 13 |
2170 |
Indian Springs Station Maintenance Burney Station Maintenance |
January 14 |
1890 |
Indian Springs Station Maintenance Burney Station Maintenance |
January 15 |
2080 |
Indian Springs Station Maintenance Burney Station Maintenance |
January 16 - 19 |
2220 |
Indian Springs Station Maintenance |
January 20 |
2200 |
Indian Springs Station Maintenance Delevan Station Maintenance |
January 21 - 22 |
2160 |
Indian Springs Station Maintenance Delevan Station Maintenance Gerber Station Maintenance |
January 23 - 27 |
2220 |
Indian Springs Station Maintenance |
January 28 |
1970 |
Indian Springs Station Maintenance Tionesta Station Maintenance |
January 29 |
2110 |
Indian Springs Station Maintenance Tionesta Station Maintenance |
January 30 - 31 |
2220 |
Indian Springs Station Maintenance |
Capacity in MMcf/d | ||||
---|---|---|---|---|
Dates | Kettleman | Hinkley | Topock | Notes |
January 06 - 10 |
920 |
920 |
945 |
Hinkley Station Maintenance |
Limitations at Specific Interconnect Points
Redwood Path
Dates | Capacity | Notes |
---|
Capacity information is in MMcf/d
Baja Path
Dates | Capacity | Notes |
---|---|---|
December 01 - 31 |
774 |
El Paso Interconnect at Topock limited for maintenance |
January 01 - 14 |
774 |
El Paso Interconnect at Topock limited for maintenance |
January 15 - 31 |
797 |
El Paso Interconnect at Topock limited for maintenance |
Capacity information is in MMcf/d
Storage Maintenance
Injection
Dates | Available Injection | Notes |
---|
Capacity information is in MMcf/d
Withdrawal
Dates | Available Withdrawal | Notes |
---|
Capacity information is in MMcf/d
Forecasts
Supply and Demand
Forecast for | Forecast for | |
---|---|---|
COMPOSITE TEMPERATURE Historical Average for current day: 48.3 |
||
Demand | ||
On-System Demand | ||
Off-System Deliveries | ||
SoCal Gas KRS | ||
Southwest Gas | ||
Kern River GT - HDL | ||
Transmission Shrinkage | ||
Injection | ||
PG&E Storage Injection (311 Maximum)* | ||
Wild Goose Storage | ||
Central Valley Storage | ||
Lodi Storage | ||
Gill Ranch Storage | ||
Total System Demand | ||
Supply | ||
Interconnect Supply | ||
Gas Transmission Northwest | ||
Ruby | ||
California Production | ||
SoCal Gas (KRS) | ||
Kern River GT - HDL | ||
Kern River GT - Daggett | ||
Southern Trails | ||
El Paso Natural Gas | ||
Transwestern | ||
Withdrawal | ||
PG&E Storage Withdrawal (969 Maximum)* Core, Market Center, and Pipeline Balancing |
||
Wild Goose Storage | ||
Central Valley Storage | ||
Lodi Storage | ||
Gill Ranch Storage | ||
Total System Supply | ||
Inventory Change (Supply - Demand) | ||
Total Customer Imbalance |
Storage Activity
Forecast for |
Forecast for |
|
---|---|---|
Injection | ||
PG&E StorageCore and Market Center | ||
Wild Goose Storage | ||
Central Valley Storage | ||
Lodi Storage | ||
Gill Ranch Storage | ||
Pipeline Balancing Injection | ||
Withdrawal | ||
PG&E StorageCore and Market Center | ||
Wild Goose Storage | ||
Central Valley Storage | ||
Lodi Storage | ||
Gill Ranch Storage | ||
Pipeline Balancing Withdrawal |