"PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. © 2025 Pacific Gas and Electric Company. All rights reserved.
California Gas Transmission
Pipe Ranger
OFO/EFO Outlook
Date | OFO/EFO | Reason |
---|---|---|
03/21/2025 | System Wide | High |
03/22/2025 | No OFO | |
03/23/2025 | No OFO | |
03/24/2025 | System Wide | High |
Pipeline Status
Plan 4, posted 10:13 PM PT
Last updated for the Gas Day of 03/23/2025. Next update expected by 5:30 AM PT. (The Gas Day runs from 7:00 AM to 7:00 AM PT).
Scheduling Status
|
|
System Inventory Status
Ending Inventory History | Ending Inventory Forecasts | ||||||
---|---|---|---|---|---|---|---|
MMcf |
Recent News Articles
Imbalance Gas in Storage Volume Updated - March 1-8, 2025
March 11, 2025 at 09:30 a.m.
Updating gas days March 1-8, 2025 ...
Springing Forward on March 9, 2025
March 07, 2025 at 08:10 a.m.
Time changes this Sunday at 2:00 a.m. ...
Imbalance Gas in Storage Close to Zero
February 19, 2025 at 11:58 a.m.
Possible suspension of Pipeline Balancing Withdrawal Service ...
Physical Pipeline Capacity
Physical Pipeline Capacities As of
(Receipt Point Capacity, MMcf)
|
||
---|---|---|
Redwood Path |
||
Redwood Path Capacity |
||
From Gas Transmission NW |
||
From Ruby |
||
Baja Path | ||
Baja Path Capacity – Topock |
||
Baja Path Capacity – Hinkley |
||
Baja Path Capacity – Kettleman |
||
From KRGT - HDL |
||
From KRGT - Daggett |
||
From SoCalGas |
||
From El Paso Natural Gas |
||
From Transwestern |
||
Off-System | ||
To SoCalGas |
||
To KRGT - HDL |
Scheduled Volumes
All Volumes in Dth | ||
---|---|---|
Cycle | Cycle | |
Redwood Path | ||
From Gas Transmission Northwest |
||
From Ruby |
||
Total Redwood Path |
|
|
Baja Path | ||
From KRGT-HDL |
||
From KRGT-Daggett |
||
From SoCalGas |
||
From El Paso Natural Gas |
||
From Transwestern |
||
Total Baja Path |
|
|
Off-System | ||
To SoCalGas |
||
To KRGT-HDL |
Interactive Pipeline Map
All volumes are expressed in Dth.
All areas on the map activate on hover. Clicking a selection makes the location stay on screen.

Download Features Provided
Select Date
* Please enter any date after 07/26/2021 in MM/DD/YYYY format.
* This download feature provides a previous gas day’s final Physical Pipeline Capacity and Scheduled Volumes information.
* Yesterday's downloadable information is available after 8:00 a.m. Pacific time.
Pipeline Maintenance
Capacity in MMcf/d | ||
---|---|---|
Dates | Redwood Path | Notes |
March 20 |
2110 |
Antioch Station Maintenance Gerber Station Maintenance |
March 25 - 27 |
1570 |
Delevan Station Maintenance |
March 28 |
1675 |
Delevan Station Maintenance
Note: If ISPs (WG and CGVS) are on overall net injection, the Redwood Path capacity may increase up to 1970 MMcf/d |
April 01 - 09 |
1846 |
L-401 Pipeline Maintenance
|
April 10 |
2010 |
Burney Station Maintenance Bethany Station Maintenance |
April 11 |
2140 |
Burney Station Maintenance Bethany Station Maintenance |
April 13 |
2210 |
Burney Station Maintenance Bethany Station Maintenance |
April 14 |
2110 |
Burney Station Maintenance Bethany Station Maintenance |
April 15 |
2130 |
Bethany Station Maintenance Delevan Station Maintenance Gerber Station Maintenance |
April 16 |
2050 |
Gerber Station Maintenance |
April 17 |
2160 |
Gerber Station Maintenance |
April 21 |
2190 |
Bethany Station Maintenance |
April 22 - 27 |
1858 |
L-400-3 Pipeline Maintenance Bethany Station Maintenance
Note: If ISPs (WG and CGVS) are on overall net injection, the Redwood Path capacity may increase up to 1990 MMcf/d |
April 28 |
1852 |
L-400-3 Pipeline Maintenance Bethany Station Maintenance
Note: If ISPs (WG and CGVS) are on overall net injection, the Redwood Path capacity may increase up to 1940 MMcf/d |
April 29 |
1840 |
L-400-3 Pipeline Maintenance Bethany Station Maintenance Tionesta Station Maintenance
Note: If ISPs (WG and CGVS) are on overall net injection, the Redwood Path capacity may increase up to 1870 MMcf/d |
April 30 |
2150 |
Tionesta Station Maintenance Bethany Station Maintenance |
Capacity in MMcf/d | ||||
---|---|---|---|---|
Dates | Kettleman | Hinkley | Topock | Notes |
March 16 - 21 |
830 |
700 |
975 |
Hinkley Station Maintenance L300A Pipeline Maintenance |
March 22 - 23 |
830 |
840 |
975 |
Hinkley Station Maintenance L300A Pipeline Maintenance |
March 24 - 28 |
830 |
780 |
975 |
Hinkley Station Maintenance L300A Pipeline Maintenance |
March 29 - 31 |
830 |
840 |
975 |
Hinkley Station Maintenance L300A Pipeline Maintenance |
April 01 - 13 |
550 |
600 |
975 |
L300A Pipeline Maintenance Hinkley Station Maintenance |
April 14 |
550 |
500 |
975 |
L300A Pipeline Maintenance Hinkley Station Maintenance |
April 15 - 18 |
510 |
500 |
975 |
Milpitas Station Maintenance Hinkley Station Maintenance |
April 19 - 29 |
510 |
840 |
975 |
Milpitas Station Maintenance Hinkley Station Maintenance |
April 30 |
510 |
840 |
930 |
Milpitas Station Maintenance Hinkley Station Maintenance Topock Station Maintenance |
Limitations at Specific Interconnect Points
Redwood Path
Dates | Capacity | Notes |
---|---|---|
March 25 - 27 |
0 |
Wild Goose Storage Facility Net Withdrawal |
March 25 - 27 |
0 |
Central Valley Storage Facility Net Withdrawal |
March 28 |
225 |
Wild Goose Storage Facility Net Withdrawal |
March 28 |
71 |
Central Valley Storage Facility Net Withdrawal |
April 01 - 09 |
41 |
Wild Goose Storage Facility Net Withdrawal |
April 01 - 09 |
13 |
Central Valley Storage Facility Net Withdrawal |
April 22 - 27 |
101 |
Wild Goose Storage Facility Net Withdrawal |
April 22 - 27 |
32 |
Central Valley Storage Facility Net Withdrawal |
April 28 |
67 |
Wild Goose Storage Facility Net Withdrawal |
April 28 |
21 |
Central Valley Storage Facility Net Withdrawal |
April 29 |
23 |
Wild Goose Storage Facility Net Withdrawal |
April 29 |
7 |
Central Valley Storage Facility Net Withdrawal |
Capacity information is in MMcf/d
Baja Path
Dates | Capacity | Notes |
---|---|---|
March 01 - 31 |
797 |
El Paso Interconnect at Topock limited for maintenance |
April 01 - 30 |
774 |
El Paso Interconnect at Topock limited for maintenance |
Capacity information is in MMcf/d
Storage Maintenance
Injection
Dates | Available Injection | Notes |
---|---|---|
March 17 - 21 |
120 |
Storage Inventory Verification maintenance at PG&E McDonald Island. This will impact injections, withdrawals and pipeline balancing. |
Capacity information is in MMcf/d
Withdrawal
Dates | Available Withdrawal | Notes |
---|---|---|
March 17 - 21 |
190 |
Storage Inventory Verification maintenance at PG&E McDonald Island. This will impact injections, withdrawals and pipeline balancing. |
Capacity information is in MMcf/d
Forecasts
Supply and Demand
Forecast for | Forecast for | |
---|---|---|
COMPOSITE TEMPERATURE Historical Average for current day: 55.1 |
||
Demand | ||
On-System Demand | ||
Off-System Deliveries | ||
SoCal Gas KRS | ||
Southwest Gas | ||
Kern River GT - HDL | ||
Transmission Shrinkage | ||
Injection | ||
PG&E Storage Injection (175 Maximum)* | ||
Wild Goose Storage | ||
Central Valley Storage | ||
Lodi Storage | ||
Gill Ranch Storage | ||
Total System Demand | ||
Supply | ||
Interconnect Supply | ||
Gas Transmission Northwest | ||
Ruby | ||
California Production | ||
SoCal Gas (KRS) | ||
Kern River GT - HDL | ||
Kern River GT - Daggett | ||
Southern Trails | ||
El Paso Natural Gas | ||
Transwestern | ||
Withdrawal | ||
PG&E Storage Withdrawal (823 Maximum)* Core, Market Center, and Pipeline Balancing |
||
Wild Goose Storage | ||
Central Valley Storage | ||
Lodi Storage | ||
Gill Ranch Storage | ||
Total System Supply | ||
Inventory Change (Supply - Demand) | ||
Total Customer Imbalance |
Storage Activity
Forecast for |
Forecast for |
|
---|---|---|
Injection | ||
PG&E StorageCore and Market Center | ||
Wild Goose Storage | ||
Central Valley Storage | ||
Lodi Storage | ||
Gill Ranch Storage | ||
Pipeline Balancing Injection | ||
Withdrawal | ||
PG&E StorageCore and Market Center | ||
Wild Goose Storage | ||
Central Valley Storage | ||
Lodi Storage | ||
Gill Ranch Storage | ||
Pipeline Balancing Withdrawal |