Transportation Rates

By Path

Redwood Path Off PG&E's System

Malin Receipt Point Reservation Rate ($/Dth/month)

($/Dth/Month)

Usage Rate ($/Dth)

($/Dth)

Total* ($/Dth @ full contract)

($/DTH @ Full Contract)

Rate Schedule (PDF)

Annual Firm

One year minimum term

G-AFT
MFV Rates - Kern River Station delivery only
SFV Rates - delivery to Kern River Station or on-system delivery point

Negotiated Firm

Term, take and rate are negotiable
Rates are capped at 120% of Annual Firm MFV rates in Schedule G-AFTOFF

G-NFT

As-Available

One day minimum term rates

G-AA
Rates

Negotiated As-Available

Term, take and rate are negotiable
Rates are capped at 120% of As-Available rates in Schedule G-AAOFF

G-NAA

* Total rates illustrate the average backbone transmission charge incurred by a firm shipper, using its full contract quantity, at 100% load factor.