IMPORTANT

Cluster 15 Interconnection Process Request for Information

Resources for Cluster 15 Interconnection Queue Participants

Overview

 

Pacific Gas and Electric Company’s Wholesale Electric Power Procurement team (“PG&E”) is issuing this Interconnection Process Request for Information (“IP RFI”) in order to participate in the California Independent System Operator Corporation’s (“CAISO”) load serving entity (“LSE”) Cluster 15 commercial interest point allocation process under CAISO’s pending tariff amendments filed in Federal Energy Regulatory Commission (“FERC”) Docket No. ER24-2671 on August 1, 2024.

 

Point Allocation

 

PG&E reserves the right to allocate its LSE commercial interest points to Cluster 15 interconnection queue participants at its sole discretion in accordance with the CAISO tariff Appendix KK (Resource Interconnection Standards) and all applicable law.

 

To participate in PG&E’s IP RFI and potentially receive PG&E’s commercial interest point allocations, Participants must provide documentation to PG&E proving that at minimum the Project has met the following requirements:  (1) at least 90% site control as required by FERC Order No. 2023, (2) transmission plan deliverability (“TPD”) available in the Project’s interconnection zone, and (3) TPD available at the Project’s point of interconnection (“POI”).

RFI Materials

 

All RFI documents are located on the applicable Wood Mackenzie online platform site and are to be accessed, downloaded, and submitted for participation in PG&E's IP RFI.

 

Wood Mackenzie Registration

 

All participants will need to register with the Wood Mackenzie online platform using the link below to gain access to submit information into the IP RFI.

     

    Contact Information

     

    For information or questions on the Cluster 15 IP RFI, please email IPRFI@pge.com.

     

    To receive notices about this RFI and to be added to PG&E's RFO Distribution List, visit Distribution List Form.

     

    Accessibility

     

    If you encounter any digital or disability access issues, or you would like to provide PG&E with feedback or suggestions regarding such access, please email our team at solicitationaccessibility@pge.com. This mailbox is monitored during regular business hours (M-F; 8 A.M. - 5 P.M.).  We will respond to your inquiry within 2 business days.

    More resources

    Interconnection

     Explore interconnection to the grid with the California Independent System Operator (ISO).

     

    • The ISO manages the flow of electricity across the grid's high-voltage, long-distance powerlines.