Is your company seeking access to PG&E's pole top antennas? Any companies doing work on PG&E equipment or property must be PG&E-approved. Below are details about the joint utility processes and requirements.
Error: Field cannot left blank.
Error: Invalid entry. Do not use equal signs [=] or colons [:].
Error: Field cannot left blank.
Error: Invalid entry. Do not use equal signs [=] or colons [:].
Terms and Conditions: Exhibits
- Exhibit 1 - Subcontractor and Supplier Utilization Plan Instructions - June 2023 (PDF)
- Exhibit 1A - Subcontractor and Supplier Utilization Plan - December 2022 (DOCX)
- Addendum NERC Requirements CIP-013 (PDF)
- Exhibit DATA-1 (rev February 2023) - PG&E Data Protection and Cybersecurity Requirements (PDF)
- Exhibit 2 PGE Supply Chain Responsibility Policy - May 2023 (PDF)
- Exhibit 2A Utilization of Small Disadvantaged Business Concerns Policy - May 2023 (PDF)
- Exhibit 3 Federal Contracting Requirements - May 2023 (PDF)
- Exhibit 4 PG&E Drug and Alcohol Policies - May 2023 (PDF)
- Exhibit 5 Management of PG&E Contractor Documents - December 2022 (PDF)
- Exhibit 6 Audit Rights - November 2015 (PDF)
- Exhibit 7 NERC Requirements - March 2022 (PDF)
- Exhibit 8 Supplier Code of Conduct - August 2024 (PDF)
- Exhibit SQA Supplier Quality Assurance - August 2024 (PDF)
Access to equipment and property
Execute the pole top master license agreement
PG&E allows access to pole tops on its solely or jointly owned poles infrastructure in accordance with the rules and requirements of the California Public Utilities Commission (CPUC).
Qualified companies (Commercial Mobile Radio Service [CMRS] carriers) may start the request for information and access process once they execute our master license agreement.
- Download a master license agreement (PDF)
- To complete an agreement, contact the joint utilities department at jointutilities@pge.com
Once you've entered into a master license agreement with PG&E, follow these steps:
- Request a PG&E map by sending the map request form (PDF) and an area map to pgepoledatarequest@pge.com.
- Submit Exhibit A (PDF) – Request for Access Form – with PG&E map, marked with the desired pole, and as applicable submit construction drawings through Customer Connect Online – Your Projects.
- Pay engineering advance.
- Schedule the pre-flight process with job owner.
- If a pole is approved, execute the contract and submit payment to PG&E.
- PG&E coordinates construction with customers when payment is received, and dependencies are met.
- When construction is complete applicant sends signed Exhibit A part 3 to PG&E, and the pole top antenna request is complete.
PG&E standards
Any companies doing work on PG&E pole tops must be PG&E-approved. Companies must also comply with PG&E's pole-top antenna installation standards. You'll receive the latest version once you've executed a master license agreement and a non-disclosure agreement. The standards are updated from time to time.
Download the PG&E nondisclosure and use of information agreement (PDF)
In addition to the above, any company entering into a master license agreement with PG&E agrees to meet all construction and safety standards prescribed by the master license agreement, including CPUC – General Order 128 and those that PG&E may prescribe now and at any point in the future.
Execute the overhead master license agreement
PG&E allows access to excess capacity in its utility pole infrastructure in accordance with the rules and requirements of the California Public Utilities Commission (CPUC).
Note: The following process does not include Commercial mobile radio service/antenna attachments. For such inquiries, visit Pole Top Antenna Access.
Qualified companies (competitive local exchange carriers (CLECS) and Cable TV Corporations) may start the request for information and access to the pole space process once they execute our master license agreement.
- Download a master license agreement (PDF)
- To complete an agreement, contact the joint utilities department at jointutilities@pge.com
Once you've entered into a master license agreement with PG&E, follow these steps:
- Request a PG&E joint utility map by sending a map request form (PDF) and an area map to pgepoledatarequest@pge.com.
- Request pole data sheets for poles to be applied for, using a marked PG&E joint utility map. (For poles greater than 15 years old with an intrusive inspection date greater than five years old, the applicant must have an intrusive inspection performed and submit the results with the job application.) Complete the pole data request form (PDF) and attach the marked joint utility map, identifying PG&E solely-owned poles with your assigned location number. Send the request to pgepoledatarequest@pge.com
- Submit job application including Exhibit A (PDF), Pole Loading Calculations, Make-ready Forms, Marked Joint Utility Maps, and Intrusive Inspection Data for all Poles to pgestructureaccesstelco@pge.com
- Receive approval or denial from PG&E Senior New Business Representative within 45 days.
- If your locations have been approved for attachment, attach to the approved pole(s) within 30 days and submit signed Exhibit A, Part 3 to your Senior New Business Representative.
PG&E standards
Preparatory work performed prior to application submission and work performed upon application approval must meet General Order 95 Requirements and PG&E standards, per the Standard Overhead Master License Agreement. PG&E standards are subject to change.
Execute the underground space master license agreement
PG&E allows access to excess capacity in its underground conduit infrastructure in accordance with the California Public Utilities Commission (CPUC). Qualified companies (competitive local exchange carriers or CLECs) may start the request for information and access processes once they execute our master license agreement.
- Download a master license agreement (PDF).
- To complete an agreement, contact the Joint Utilities Department at rightofwayaccessconduit@pge.com.
Once you've entered into a master license agreement with PG&E, follow these steps:
- Request PG&E map. Attach a Conduit Mapping Request form together with a marked area map (such as from Google Maps) and send to pgepoledatarequest@pge.com.
- Submit Exhibit A – Request for Access Form (attached to master license agreement) with PG&E map, marked with the desired route (20-manhole limit per submission); include letter of intent that describes approximate total footage, manholes to be accessed, any manholes to be cored, and start and end locations. Pay deposit for route investigation.
- Receive results of feasibility study.
- If your route is feasible, submit construction package for PG&E approval, including contractor proposal information. Pay estimate for any PG&E expenses incurred during construction.
- Upon approval, coordinate a construction start date with PG&E and schedule a pre-construction safety meeting.
- Submit as-built drawings within 90 days of construction completion.
- Email documents rightofwayaccessconduit@pge.com.
Disclaimers
This process is for the Right-of-Way Conduit Access only and does not include job design services. For questions about the PG&E job design of viable conduit routes, contact the New Revenue Development Department at nrdfiberoperations@pge.com.
PG&E retains the option to revoke any licenses if the routes of any conduits or other structures along the routes become necessary to serve core gas or electric customers.
For general information about the right-of-way conduit access request process, and to inquire about establishing a master license agreement, email your request to rightofwayaccessconduit@pge.com.
PG&E's standards
All companies working in our underground conduits must be approved by PG&E. Approval requires registration in ISNetworld and a grade of 'B' or better in PG&E's contractor safety program, plus current certification in PG&E's Gold Shovel Certification Program.
For more information, visit:
Companies must also comply with PG&E's latest fiber optic cable installation standards.
- You'll receive the latest version once you've executed a master license agreement and a non-disclosure agreement. The standards are updated from time to time.
- Download the PG&E Nondisclosure and Use of Information Agreement (PDF)
In addition to all the above, any company entering into a master license agreement with PG&E agrees to meet all construction and safety standards prescribed by the master license agreement, including CPUC – General Order 128 and those that PG&E may prescribe now and at any point in the future.
Other resources
A key control for PG&E is having a purchase order in place for each good or service we purchase from your organization before any work begins.
We will be investigating and installing corrective actions for each instance where an after-the-fact purchase order has to be issued. Please register the AFPO activity in the application link below to report situations where you have already commenced work without a purchase order first being issued.
Interested in working with PG&E? Find available opportunities and learn how to apply.
Learn about our supplier code of conduct, environmental sustainability and supplier diversity programs.
Visit Supply Chain Responsibility
Register your company as a potential PG&E supplier. You may also login to your account for maintenance or reporting.
Visit the Supplier Profile Registration and Maintenance page
Please be sure to read and understand our Supplier Quality Requirements for Materials and our Supplier Qualification Manual.
Suppliers that provide material that is considered "high risk" are required to be ISO 9001 certified. Please access the documents below for a list of material families that are risk ranked as "high."
On Oct. 24, 2016, PG&E launched a web-based solution (eSCR) to replace the paper forms and email process currently used to submit Supplier Change Requests. While the Change Management Process and its requirements haven’t changed, eSCR allows suppliers to launch the process via an online form and submit the required documentation as attachments.
The Supplier Change Request program provides a formal system for assesing, tracking and documenting material recalls and changes that affect fit, form or function of procured material – including but not limited to changes in manufacturing site location, changes in sub-suppliers and changes to key manufacturing equipment. The SCR program requires pre-approval of those changes to avoid the adverse effect of random changes.
Visit the eSCR Supplier Portal
More information
Electronic Supplier Change Request
Training for Suppliers
If you have questions about eSCR, email eSCRAdmin@pge.com. For more information about PG&E's Supplier Change Request program, refer to the Supplier Qualification Manual (PDF)
Find out what PG&E contractors need to do before beginning any excavation work.
Find more information about PG&E’s commitment to contractor safety.
Due to climate and environmental issues in the state of California, wildfire is a significant threat needing attention for prevention and mitigation. Therefore, PG&E has revised procedural standards to best support addressing this urgent situation.
All suppliers working in the field are expected to adhere to these requirements taking responsibility for actions which could potentially cause wildfire. This includes awareness of wildfire risk in geographic areas where work is to be performed, properly outfitting vehicles and personnel with adequate training and tools; ensuring each individual is accountable for preventing and mitigating potential wildfire risk.
- Preventing and Mitigating Fires While Performing PG&E Work (PDF)
- Attachment 1, Wildfire Mitigation Matrix (PDF)
- Attachment 2, Wildfire Risk Checklist (PDF)
- Reporting Ignitions on the Jobsite – English (PDF)
- Reporting Ignitions on the Jobsite – Spanish (PDF)
Report a cybersecurity incident
Use the form below to notify PG&E immediately of any cyber-related incident or vulnerability.
If you need help completing this form, please call 1-877-660-6789.
*indicates required field
Contact us
Have questions?
If you have additional questions about supply chain responsibility, email supplierdiversityteam@pge.com or call 510-898-0310.
©2024 Pacific Gas and Electric Company
©2024 Pacific Gas and Electric Company